For this project, myself and three other classmates were tasked with designing a full pipeline system for a manufacturing plant called Continental Ag. in Dayton, Ohio. This involved developing several sub-systems to supply the plant’s machines with coolant, transfer coolant to a storage facility, and transfer the coolant for transporting and processing. This was a semester-long project that incorporated all concepts learned in class and assignments. The full pipeline system was designed from scratch based on set constraints provided by the instructor. Below you will find a PowerPoint Presentation that gives specifics about the design of the project and highlights some of the calculations performed. For even more information, see the full report below.